Pall Mall
Location : Liverpool
Principal Contractor : Graham
Project Summary : Development of a 22 Floor tower and 10 Floor lower block With 336 apartments
Contract Value : £11m
Scope:
Supply and Install of Piling Matt/Pile Attendance/Pile Cropping
Groundworks/Drainage and Substructure Reinforced Concrete Works
2 R.C Frames - Post Tensioned Suspended Slabs
Loading Out Toilet Pods/Metsec/Plasterboard for follow on trades
Midwest Precast Ltd - Design, Supply and Install of Precast Columns/Twinwall Stair Cores and Lift Shafts and PCC Staircases/Landings